النتائج (
العربية) 1:
[نسخ]نسخ!
Referring to the a/m subject, the stair no. S04 in F5 is changed to masonry stair instead of steel stair, where it starts from level +19.40 to +20.30 in the Supervisor Room F05.253 with 6 steps, where gandola granite is used as floor finish for the stairs. Please review and confirm.
يجري ترجمتها، يرجى الانتظار ..
