We have submitted load calculation , and its proving that the total load is less than 200 KW . As per the tender if the load is less than 200 KW we supply the new panel from MCC-ALT-1. Please refer document No. ME15011‐E‐GCA‐001-R01
Note: We have checked the main cable and its sufficient to new load.