النتائج (
الإنجليزية) 3:
[نسخ]نسخ!
Maintains the investment opportunities of the project, Almwssh resorted to the use of methods that usually used, which relies on the analysis of the relationship between the benefits and costs of an idea, can be determined. The costs and benefits of nature, while can not determine the value of others if the costs and benefits of the type whose value can be determined as the costs and benefits of concrete, and was said to be of difficult to define the value of it in the long run lead to values. She called for specific and concrete benefits.
يجري ترجمتها، يرجى الانتظار ..
