Trolley for pouring siteTransporting chains for pre-cutting (first) curingtonal, include 4 chains with 4 gearboxes and motors.Trolley for demoulding site.Trolley for the after cutting site.Transporting chains for finish (second) curing tonal, include 8 chains with main gearbox and motor.Trolley for unloading site.Transporting chains from unloading site to pouring, include.Main control panel for include moving systemMechanical catch for mould removing Include catcher and rails systemMould with trolleyComponents of pneumatic systemCutting complex REEF-1Horizontal cutting standPusher for mould across cutting standsBelt conveyers for waste