After collection data will be start in steps input the geometric data to Civil-3D program and design the types of interchanges, build of model in Synchro program for the design of interchanges, Run the Synchro program to simulation condition of interchanges, Measure of effectiveness (MOEs) that consider in the analysis included Delay, and density, also will be analysis of safety, and study economical includes construction cost and right of way.