floor boxes was implemented in wrong location because the contractor not used the latest update furniture layout and electrical shop drawings after modification (approved as noted), Although we alerted the contractor for using the latest update for all of this.
The problem about exact location of Floor box was discussed with the contractor and will be adjusted