Dear Georges,
· Please note that the required plinth on the “second floor lounge” area and in the “archive room” is to be a ceramic plinth same thickness as the floor and from the same type of the ceramic flooring, no other type is to be used, and for the height please follow the drawings. Regarding the toilets and the kitchens wall and floor are to be fully covered by ceramic as per provided and approved design by DAR.
· On the second floor level, the flooring finish is to be as discussed from a marble type which is honed, flamed or sandblasted, sample to be approved prior to execution, as well as the recessed plinth for the alucco-bond cladded walls to be from a marble type.
· The gutter system is to be used for the rain water drainage connected to risers all along the façade through the parapet as discussed on the 2nd floor terrace, and which will be located between the flooring tile surface on the side wall of the parapet.
Consequently the actual installed rain water drainage provided on site on the second floor terrace (and shown in the report # 78 as below by contractor) are to be removed and replaced by the aforementioned system.