النتائج (
الإنجليزية) 3:
[نسخ]نسخ!
 
This indicator will be measured in accordance with the steps performed by the overall steps. There are three main steps to complete a project.0 of the studies outlined above for) the studies required is the implementation of studies and data collection work.To measure the parameters of population and hire gate optimization (this step includes following details: -Thwyl statistical model to the mechanical model.Akhtbar robot model in theory, and to ensure the safety of operation effectively.Akhtbar robot model in theory, and to ensure the safety of operation effectively.The 0 outputs of the project presented to the chairman of the board and the approval of the issuing decision to implement the "model" functionImplementation of the study (director), and the actors involved in the implementation.3. The placement on the inclusion in the model and the coordination with the concerned party to answer their queries.And training their cadres to work on automatic model.
يجري ترجمتها، يرجى الانتظار ..
