worth Ot td Torbanhmegj an. Cite re nee t The price Includes octantIon In all types of SOILS (oven rock Layers) up to depth" hatocen 0.7 to 0.5m according to she. Excavation of ovarbionlant Excavation In any kind of "oil Marling at existing ground Inch, Including removal of surplus excavated malarial' From site to en approved dumping area, complete ■i %pacified In the drawing", all according to specification' end site Engineer holt uct 10111. Open (Thatinel Spillway Excavation. IT,nntanglnat